Skip to navigation
Skip to content
Bamboo failed to run the backup on 25 Apr 2025. See the logs for further details.
Linked Applications
Loading…
Atlassian Bamboo
Build
All build plans
Build activity
Deploy
All Deployment Projects
Reports
Reports
Authors
Help
Online help
About Bamboo
Log in
Sign up
Bamboo failed to run the backup on 25 Apr 2025. See the logs for further details.
Build projects
Warehouse Mobile
DEVELOPMENT
Build #371
Previous
#366 (Successful)
#367 (Successful)
#368 (Successful)
#369 (Successful)
#370 (Successful)
#371 (Successful)
#372 (Failed)
#373 (Failed)
#374 (Not built)
#375 (Failed)
Next
Build:
#371
was successful
Job:
Tablet Director
was successful
Stages & jobs
Tablet Director Stage
Tablet Director
Host Agent Stage
Job Summary
Tests
Commits
Artifacts
Logs
Metadata
Code commits
TabletDirector-develop
David Butt
23 Nov 2015
a4d7ea50e02be4c6debb9999251ec977c9bca5bd
2.2.7 merge up changes
TabletDirector/Controllers/WebServiceController.cs
(diffs)
TabletDirector/Models/DatabaseModels/AppSettings.cs
(diffs)
TabletDirector/Views/AppSettings/Edit.cshtml
(diffs)
Edit Plan